TASK 3: Accurate actions for the reduction
of the flow of eutrophic elements (Phosphorus and Nitrogen)
Endine Lake |
|
- Filter ecosystem
for the refinement of the waters from the
superficial grid of the area called "Fossadone"
- Filter ecosystem for the refinement of the
waters from the superficial grid of the area
called "Valle del ferro"
- Filter ecosystem for the refinement of the
washing waters of the state road 42. |
|
Candia Lake |
|
- Filter ecosystem
for the refinement of the Candia purification
plant effluent
- Filter ecosystem for the Canale di Caluso
water treatment
- Filter ecosystem for the Frazione Rossi
water treatment
- Filter ecosystem for the Frazione Margherita
e Bigoglio water treatment |
|
The aim of the third task is to plan constructed wetlands
designed to reduce quantities of eutrophicating substances
by means of special filtration ecosystems at the drainage
outlets into the lake, or to complete the treatment
carried out by existing purification plants, improving
the quality of the effluent.
|